Skip to content
PlaybookEditable template included

Create a client file handoff people can actually use

Find the authoritative assets, check the recipient's access, and record what is missing before ownership changes. Includes a worked inventory and an editable handoff checklist.

file-handoffsclient-operations

A folder link is not a complete handoff. The next person still needs to know which files are current, what they are allowed to use, what is missing, and who answers questions.

Use this when a client account changes hands, a project reaches delivery, or scattered working files are slowing the team down. You will produce a small asset inventory, a canonical starting point, an access check and an acceptance record.

Start with the agreed deliverables and existing file locations. You do not need to reorganize the entire account before making one handoff usable.

1. Define the receiving job

Name the receiving person and what they need to do next: update the website, prepare a campaign, maintain the brand, or operate a delivered workflow.

List the required assets for that job. A website handoff might need approved copy, source images, brand files, published page links and operating instructions. It does not automatically require every draft from the project.

Record the boundary: what this handoff covers, what stays with another owner, and what requires separate access approval. Keep passwords, tokens and other secrets out of the inventory and worksheet. Use the organization's approved access-management process.

2. Choose an authoritative home

For each required asset, identify one canonical location and one responsible owner. When several files look final, resolve the difference before labeling one approved.

Preserve useful history. Mark an older file superseded and link to its replacement rather than deleting it to make the folder appear tidy. Renaming or moving files can affect existing references; check dependencies before changing them.

Use names that help a new person distinguish purpose, status and version. “Roof-photo-homepage-approved-2026-10-02” carries more information than “final-final-new,” but a clear name does not prove approval. Record the approval reference separately.

Working method / 04

A link is only the beginning.

  1. 01

    Inventory

    Know what is included

    List each deliverable, format, version, and purpose.

  2. 02

    Canonical home

    Choose one source

    Link the final location. Identify drafts and superseded copies.

  3. 03

    Access test

    Check as a recipient

    Verify the intended account can perform the required action: view, download, or edit.

  4. 04

    Acceptance

    Close the loop

    Name who confirms receipt, what is missing, and who supports it.

Review point

An owner being able to open a file is not evidence that the client can open it.

A usable handoff identifies the files, establishes the source of truth, and proves the recipient can use it.

3. Build the smallest useful inventory

Fictional example. An agency is handing Cedar Ridge Roofing's website assets to a new account operator. These labels describe example files, not live links.

AssetCanonical itemStatus and useOwner / next action
Logo packageBrand folder: approved logo packageApproved for the website; approval reference attachedClient brand contact
Homepage roof photoMedia folder: roof-photo-homepageApproved image; usage permission recordedAgency operator checks recipient access
Inquiry form copyWebsite folder: form-copy-v2Approved wording; published page linkedWebsite delivery lead
City service-area listPending inputMissing; city-page publication remains blockedClient manager to confirm by October 8
Website operating notesHandoff folder: website-runbook-v1Draft awaiting recipient reviewOutgoing operator
An example handoff inventory, including a visible gap

The missing service-area list belongs in the handoff. Omitting it would make the next operator discover the dependency by attempting the work.

For each asset, add the actual URL, file type, version or last-updated date, approval evidence, access level and any usage limitation. For complex projects, split inventories by receiving job rather than creating one enormous table.

4. Test access as the recipient

Ask the receiving person to open representative files with their own account, including the canonical starting document. Where your tools support it, inspect the effective permissions as well.

Check the action they actually need: view, comment, edit, download, or administer. Seeing a preview does not establish the ability to edit the source. Your own administrator access is not evidence that the recipient can open it.

Record who tested, when, what action succeeded, and any remaining request. Grant only the access approved for that recipient and job. Do not solve a failed handoff by making the entire folder public.

5. Walk through one real task

Have the recipient find the current asset and complete a representative next step, such as locating the approved form copy and identifying the person who can authorize a change.

Ask them to explain where they would look for a replacement image or unresolved decision. A broken link is one failure; a perfectly accessible folder that nobody understands is another.

Finish with an acceptance record: received, usable for the named job, remaining gaps, new custodian, and a follow-up date. Acceptance can be qualified. “Received except for the service-area list, due October 8” is more accurate than a green checkmark.

Common failure modes

  • Everything is called final. Identify the approved version and preserve the approval reference.
  • The receiver needs a source file but gets an export. Include the editable source when it is part of the agreed deliverable, with the correct permission.
  • Permissions expire or belong to an outgoing person. Record the accountable custodian and use your approved ownership-transfer process.
  • A reorganization breaks links. Update references deliberately and test the important paths.
  • A file can be opened but cannot be used. Record relevant approval and usage restrictions; escalate uncertainty to the responsible owner.

Handoff acceptance check

  • The receiving person and next job are named.
  • Each required asset has a canonical location and owner.
  • Current versions, approvals and superseded material are distinguishable.
  • Missing items have an owner, consequence and follow-up date.
  • The recipient tested the required access with their own account.
  • One representative task was completed.
  • Acceptance and any remaining exceptions are recorded.

The editable worksheet contains the inventory, access test and acceptance note. It organizes the handoff; it does not move files or change permissions for you.

Included with this playbookVersion 2026-10-03.1

Put it to work.

Identify authoritative assets, test recipient access, and record gaps and handoff acceptance.

Editable template / Markdown

Client file handoff inventory

Inside the template
  1. Handoff purpose
  2. Asset inventory
  3. Missing items
  4. Recipient access test
  5. Representative task
  6. Acceptance record
Preview the full template
# Client file handoff

Private working draft. Record links and ownership, not passwords, tokens or credentials. Use the approved access-management process for permissions and ownership changes.

## Handoff purpose
- Client / project: [name]
- Outgoing owner: [person]
- Receiving person / role: [person]
- Handoff date: [date]
- Job the recipient must do next: [specific task]
- Included deliverables: [scope]
- Excluded or separately owned material: [boundary]
- Canonical starting document / folder: [link]

## Asset inventory
| Required asset | Canonical URL | File type / version / updated date | Approved / draft / superseded | Approval or usage evidence | Custodian | Required access |
| --- | --- | --- | --- | --- | --- | --- |
| [asset] | [link] | [type and version] | [status] | [reference and limits] | [person] | [view / comment / edit / download / administer] |

### Version decisions
- Conflicting copies found: [files]
- Chosen authoritative version and why: [record]
- Superseded copy points to: [replacement]
- Existing links or dependencies affected by a move: [record]
- References updated and tested by / on: [person and date]

## Missing items
| Missing asset / permission / decision | Consequence for the receiving job | Owner | Follow-up date | Resolution |
| --- | --- | --- | --- | --- |
| [gap] | [blocked work] | [person] | [date] | [reference] |

## Recipient access test
Use the recipient's own account and test the action they need. Administrator access alone does not establish recipient access.

| Asset / starting point | Required action | Tested by and date | Passed / failed | Fix owner and due date |
| --- | --- | --- | --- | --- |
| [link] | [view / edit / download / other] | [person, date] | [result] | [next step] |

Approved permission change record, if needed: [reference]  
Ownership or account-departure dependency: [record]

## Representative task
- Task the recipient attempted: [find current file and perform the expected next step]
- Correct asset found: [yes / no; evidence]
- Recipient could explain approval / change route: [yes / no]
- Result: [what happened]
- Instructions clarified: [change]
- Remaining follow-up: [owner and date]

## Acceptance record
- [ ] Receiving person and next job are explicit.
- [ ] Required assets have canonical links and custodians.
- [ ] Versions, approval and usage limits are visible.
- [ ] Missing items have owners and consequences.
- [ ] Access was tested at the required level.
- [ ] One representative task was completed.
- [ ] Exceptions and follow-up are recorded.
- [ ] No credentials or unrelated private material are included.

Status: [ready for review / accepted / accepted with exceptions / not accepted]  
Received by: [person]  
Date: [date]  
Exceptions: [list]  
New custodian: [person]  
Follow-up owner and date: [record]

This worksheet does not move files or change permissions.

Make a private, editable copy in Delta, or download the template to use anywhere. Nothing is sent to a client.