Turn a client request into a brief your team can act on
Clarify the outcome, check scope, and record a decision before a casual message becomes a delivery promise. Includes a worked brief and an editable intake worksheet.
“Can you add this by Friday?” looks like a task. It may be a question, an urgent fix, a change to agreed work, or a request missing the material needed to start.
Use this playbook for requests from a client's staff about your agency's work. The result is one reviewed brief with an outcome, boundaries, owner, acceptance check and next decision. It is not a homeowner lead-handling script or a substitute for your agreement with the client.
Bring the original message, the relevant scope, and the current delivery commitments. Preserve the source message so later clarification does not overwrite what was originally requested.
1. Capture before interpreting
Record who asked, when, where the request arrived, and the exact relevant wording. Link the message where access permits; use a short accurate excerpt when it does not.
Then write your interpretation in a separate field. “Add financing to every page” might mean a navigation link, an approved information block, or a complete application flow. They are different jobs.
Acknowledge receipt without accepting an unknown delivery date:
I have the request. I am checking the pages, approved wording and delivery impact. I will confirm the proposed approach and timing by [date/time].
For an active outage or other immediate operational problem, use your existing incident route. Do not let a perfect intake form delay necessary triage; complete the record as the incident is handled.
2. Ask the smallest questions that change the work
Start with these:
- Outcome: What should a visitor or staff member be able to do afterward?
- Boundary: Which pages, channels or accounts are included?
- Inputs: Who supplies the approved copy, files and access?
- Timing: What event makes the requested date important?
- Acceptance: What observable check would let the client say the request is complete?
A question earns its place when its answer changes the deliverable, sequence, cost or risk. Avoid making the client complete an essay when one screenshot and a page list would resolve the ambiguity.
3. Check scope before committing
Compare the clarified request with the current agreement. Mark it included, possible change, or unclear, and name the person who can decide. “Small” is not a scope category.
If it changes scope, prepare the options and route them through the agreed commercial approval process. State the delivery impact and any dependency. A ticket acknowledgment, a work review, a scope approval and a signature are separate events; do not treat one as evidence of another.
For included work, check capacity and dependencies before confirming a date. If the input arrives late, use an agreed trigger such as “review draft two working days after approved wording is received” rather than silently keeping an impossible deadline.
A worked brief
Fictional example. A Cedar Ridge Roofing manager writes: “Can you add financing to every page by Friday?”
Clarify before you commit.
Request
Capture the needPreserve the client's words and the problem behind them.
Clarify
Define doneDescribe the deliverable, acceptance criteria, and missing inputs.
Scope check
Check the agreementMark in scope, out of scope, or undecided. Record the impact.
Review
Name the ownerAssign who decides and when. Confirm before scheduling work.
An unclear request is a question to resolve, not a promise to deliver.
| Field | Reviewed brief |
|---|---|
| Intended result | Visitors on three service pages can find the client's existing financing information |
| Included | One approved information block and link on the Roof repair, Roof replacement and Roof inspection service pages |
| Excluded | New application forms, payment handling, unapproved financial terms and a site-wide rollout |
| Client input | Client manager supplies the authorized wording and destination link |
| Agency owner | Website delivery lead |
| Acceptance check | Copy matches the approved text; the correct link works; layout is checked on mobile and desktop |
| Scope decision | Account owner checks the current agreement before work is scheduled |
| Timing | Requested Friday date remains unconfirmed until input and scope review are complete |
| Next action | Client manager sends wording; agency confirms the review date after receipt |
A useful reply is short: “We propose the approved financing block on the three service pages listed here. Please send the authorized wording and destination link. We are checking whether this is included in the current scope and will confirm timing after that review.”
Nothing in this brief invents financing terms or implies that an acknowledgment authorizes publication.
4. Move the request through visible decisions
Use states that mean something: captured, needs clarification, awaiting scope decision, ready to schedule, in progress, ready for review, completed or declined.
For each change, record who decided, when, and the reason. “Ready to schedule” means the outcome and boundaries are agreed and required approvals exist. “Completed” means the acceptance check passed, with evidence attached.
If a client changes the request during review, compare the new request with the agreed brief. Update the version and review its impact; do not silently rewrite the history.
Common failure modes
- The requested date becomes a promise. Label it requested until someone with delivery responsibility confirms it.
- No one owns the next question. Give each missing input an owner and follow-up date.
- The team starts from the chat message. Link the reviewed brief from the task so the clarified boundary is visible.
- A client approval is vague. Record which version and which decision the approval covers.
- Completed means “we touched it.” Attach the agreed acceptance evidence and state any remaining limitation.
Ready-to-start check
- The original request and requester are traceable.
- The intended outcome and included/excluded work are clear.
- Required inputs have owners.
- Scope and commercial questions have an explicit decision.
- The date is confirmed or still visibly proposed.
- One delivery owner and one acceptance check are named.
The editable worksheet keeps the source request, clarified brief, scope decision and completion check together. It does not automatically assign work, approve scope or communicate with the client; those remain deliberate actions in your workflow.
Put it to work.
Capture the original request, clarify the deliverable, and record scope and delivery decisions.
Client request and scope-review brief
- Original request
- Clarified brief
- Inputs and dependencies
- Scope review
- Decision and delivery record
- Completion check
Preview the full template
# Client request brief Private working draft. A requested date is not a confirmed delivery commitment. This worksheet does not replace the agreement or approval process used with the client. ## Original request - Client / project: [name] - Requester and role: [person] - Received: [date / time / channel] - Original message or source link: [reference] - Relevant original wording: [accurate excerpt] - Captured by: [person] - Acknowledgment sent: [date / person, if sent] - Next response promised: [date / time] ## Clarified brief - Desired outcome: [what the recipient or visitor should be able to do] - Included work: [specific deliverables, pages, accounts or locations] - Excluded work: [boundaries that could otherwise be assumed] - Requested date: [date] - Reason for that date: [event / dependency] - Confirmed delivery date or trigger: [leave unconfirmed until reviewed] - Acceptance check: [observable evidence of completion] - Delivery owner: [one accountable person] - Client reviewer / decision-maker: [person] ## Inputs and dependencies | Required input or answer | Why it changes the work | Owner | Needed by | Status / evidence | | --- | --- | --- | --- | --- | | [input] | [effect] | [person] | [date] | [reference] | ## Scope review - Relevant agreement / approved brief: [link and version] - Classification: [included / possible change / unclear] - Reason: [comparison with the agreed work] - Delivery impact: [capacity, sequence and timing] - Options: [proposed approach and alternatives] - Commercial or scope approval required: [decision-maker and process] - Decision: [approved / declined / needs clarification; do not pre-fill approval] - Decision evidence: [who, when, exact version and reference] ## Decision and delivery record Current state: [captured / needs clarification / awaiting scope decision / ready to schedule / in progress / ready for review / completed / declined] | Date | Decision or change | Person | Affected version / evidence | Next owner and date | | --- | --- | --- | --- | --- | | [date] | [decision] | [person] | [reference] | [next step] | ### Client confirmation draft We understand the request as [outcome]. The proposed work includes [included] and excludes [excluded]. We need [input] from [owner] by [date]. [Scope decision / remaining question]. Timing is [confirmed date or explicitly unconfirmed]. We will consider the work complete when [acceptance check]. Review this text and send through the agreed channel only when appropriate. ## Completion check - [ ] The original request is traceable. - [ ] Outcome, boundaries and acceptance are agreed. - [ ] Inputs and dependencies have owners. - [ ] Required scope/commercial decisions are recorded. - [ ] Delivery timing is explicitly confirmed or still proposed. - [ ] Work passed the acceptance check. - [ ] Evidence and client review are linked. - [ ] Any later request is recorded as a change, not silently added. Completion evidence: [link] Remaining limitation: [description or none] Completed / accepted by and date: [record]
Make a private, editable copy in Delta, or download the template to use anywhere. Nothing is sent to a client.